Gujarat Affairs
Mega line to be desilted, 1.1k units to stop production
Around 1,100 chemicals and textiles units in key industrial areas like Naroda,Odhav, and Vatva will remain shut for around 10 days from March 5 as the Ahmedabad Mega Clean Association (AMCA) will carry out desilting work of the mega pipeline.
To do this work, AMCA will also put meters at key locations to measure effluent water flow.
AMCA, the operating body of the mega line of industrial effluent ofcommoneffluent treatment Plants (CETPs), has told its members that the desilting activity starts from March 5 and no discharge would be allowed in the mega line till the desilting work is completed.
The mega line was set up in 2001 to carry treated effluent water from Odhav, Naroda and Vatva CETPs. It is a 27km line with a capacity of 75 MLD.
National and International Affairs
Unable to retrieve posts. GPSC Notes brings Prelims and Mains programs for GPSC Prelims and GPSC Mains Exam preparation. Various Programs initiated by GPSC Notes are as follows:-- GPSC Mains 2024 Tests and Notes Program
- GPSC Prelims Exam 2024- Test Series and Notes Program
- GPSC Prelims and Mains 2024 Tests Series and Notes Program
- GPSC Detailed Complete Prelims Notes